
Installers planning a 400G connection can use this 1m (3ft) DAC cable where Arista Networks equipment specifies CAB-D-8S-400G-1M. Its QSFP-DD to 8x SFP56 arrangement arrives as one complete assembly, reducing the number of separate interfaces to handle during rack work. The physical routing notes and factory checks below apply to this exact length.
OEM Part Number: CAB-D-8S-400G-1MHT Part Number: CAB-D-8S-400G-1M
| HT Part Number | CAB-D-8S-400G-1M |
|---|---|
| Arista Networks Compatible | CAB-D-8S-400G-1M |
| Manufacturer | HT |
| Form Factor | QSFP-DD to 8x SFP56 |
| Max. Data Rate | 400Gbps |
| Media | Copper |
| Cable Type | Passive Breakout DAC |
| Minimum Bend Radius | 33.5mm |
| Wire AWG | 30AWG |
| Cable Length | 1m (3ft) |
| Jacket Material | PVC (OFNR) |
| Max. Power Consumption | 0.1W (QSFP-DD End)0.1W (SFP56 Per End) |
| Modulation Format | QSFP-DD-8x 50G-PAM4SFP56-50G-PAM4 |
| DDM/DOM | Not Supported |
| Commercial TemperatureRange | 0 to 70°C (32 to 158°F) |
| Protocols | QSFP-DD MSA, SFF-8432, IEEE 802.3bs-400GAUI-8, IEEE802.3cd-50GAUI-1, CMIS 4.0, SFF-8472 |
The listed modulation format is QSFP-DD-8x 50G-PAM4SFP56-50G-PAM4. Both host interfaces must be configured for the same aggregate rate and lane arrangement. A connector that fits mechanically does not by itself guarantee that the remote port supports this encoding or breakout mode.
The QSFP-DD to 8x SFP56 configuration divides the high-speed interface into multiple lower-speed connections. Verify the upstream lane assignment, downstream port speeds and breakout setting on the host before connecting the assembly. Each branch must attach to the correct remote interface.
A passive DAC has no separate optical conversion stage. Its low-power, low-latency operation is useful for short equipment links, but the assembly must remain within the length and signaling mode accepted by both hosts.
At 1m (3ft), CAB-D-8S-400G-1M is a practical choice for direct connections within one rack. Route the cable along the intended management path rather than pulling it diagonally across adjacent connectors, and leave enough clearance for insertion, removal and front-panel airflow.
CAB-D-8S-400G-1M occupies the middle of this family between CAB-D-8S-400G-0.5M at 0.5m (2ft) and CAB-D-8S-400G-1.5M at 1.5m (5ft). It adds 0.5m over the shorter option for extra routing clearance, while the next longer version adds another 0.5m. Measure the managed path and choose this version when its reach is sufficient without creating the slack associated with the longer assembly.
Plan the managed route before removing the connector protection. The cable should reach both ports without tension while leaving enough space to release the latches and service adjacent interfaces. Support the run through the intended managers, keep the connector boots clear of sharp edges and avoid storing excess length in a tight coil behind warm exhaust air. For this assembly, the listed conductor specification is 30AWG; the minimum bend radius is 33.5mm; the stated power consumption is 0.1W (QSFP-DD End)0.1W (SFP56 Per End); the jacket material is PVC (OFNR).
The rated power consumption is 0.1W (QSFP-DD End)0.1W (SFP56 Per End). Include this load in the host-port power and thermal budget, especially in densely populated switches. Maintain front-panel clearance and do not bundle the cable so tightly that it obstructs airflow around the connectors.
This assembly uses 30AWG conductors, PVC (OFNR) jacket, minimum bend radius 33.5mm. These mechanical characteristics affect how the cable should be dressed behind the equipment. Avoid sharp edges, excessive ties and repeated tight bends close to the connector boots.
The intended application is determined by the host interface and protocol support. Listed interface and protocol references include QSFP-DD MSA, SFF-8432, IEEE 802.3bs-400GAUI-8, IEEE802.3cd-50GAUI-1, CMIS 4.0, SFF-8472. Confirm that the host firmware and port configuration support the same operating mode.
The completed cable is inspected at both ends, functionally tested and coiled with bend-safe slack. Protective packaging keeps the latches and boots from taking impact, while optional project labels can identify the two endpoint locations for easier field service. Volume orders can include customer references on the labels and carton list.
Compatibility is verified as part of a complete installation check: connector inspection, host identification and an operating link. The physical cable is evaluated together with the expected OEM identity, because a connector that fits is not sufficient evidence that the host will accept and operate the assembly correctly. The check includes link stability and diagnostic indications, followed by a final inspection of both ends.
No. It is an HT-manufactured compatible alternative for equipment that specifies Arista Networks CAB-D-8S-400G-1M.
No. Use a supported, bend-safe service loop and observe the listed minimum bend radius. Do not crease the cable or tighten ties around the connector boots.
Not necessarily. Both hosts must support the stated rate, identification, lane mapping and any required breakout configuration; mechanical compatibility alone is insufficient.
Provide the equipment manufacturer, model, port type, hardware revision and software release, together with the OEM reference, required length and quantity.
When requesting this assembly, include the exact part number and length together with the destination port types. For a rack installation, a simple port-to-port list helps us keep different lengths separate and allows any requested labels to correspond with the actual installation sequence. This page’s fixed configuration is 1m (3ft); another length must be quoted under its corresponding part number.
Standard configurations normally ship within one to three working days, while production quantities are confirmed with the order. Worldwide courier services are available, with air or sea freight for consolidated shipments; freight-collect delivery and coordination with a customer’s logistics provider can be arranged.
Thank you for the inquiry to our company; you can use this online form to leave us the message or write to sales@huihongfiber.com, we shall reply ASAP.
Working hours:
Monday through Friday
AM 9:00 to PM 6:00
Nigeria Address: Central Area, Abuja - Nigeria.
China Factory:No.55 Bldg., Tairan Block, Chegongmiao,Shenzhen
For products catalogue/data sheets or any general inquiry, please email info@huihongfiber.com and we will reply with details.
For customer support please contact:
sales@huihongfiber.com
Customer support hotline:
+86.7558339605 x 201