
For Nigerian deployments, this product should be evaluated as part of the complete network path, including its connectors, mapping and acceptance values. This fiber pigtail terminates outside-plant or backbone cable into a connectorized panel: MTP-12 APC Female to Unterminated Pigtail Trunk Cable, OS2 glass, with a factory-polished MTP APC connector on one end and a prepared fiber strand on the other. Fusion-spliced onto the incoming cable, it turns a raw fiber route into a documented, testable port. The MTP interface carries twelve fibers on one connector, which means a single splice operation terminates a full parallel-optics trunk position. At 144 fibers, one assembly replaces a dozen individual pigtail sets on the distribution frame.
Product Highlights
- LSZH Fire Safety-Rated Ensures Safety in Indoor Environments
- Double Jacket Ensures Durability and Performance in Long-distance Links
- Used to Ensure Efficient Use of Space and Rapid Network Deployment
- US Conec MTP® Connector with Optimal 0.35dB Low IL
- G.657.A1 Bend Insensitive Fiber with 10mm Min. Bend Radius
Specifications
| Connector A | US Conec MTP® Elite Female (Non-Pinned) |
|---|---|
| Connector B | Unterminated |
| Fiber Mode | OS2 9/125μm |
| Wavelength | 1310/1550nm |
| Polish Type | APC |
| Cable Jacket | LSZH |
| Fiber Count | 144 Fibers (Base-12) |
| Minimum Bend Radius | 10mm |
| Breakout Outside Diameter (OD) | 2.0mm |
| Tensile Strength | 200/660N (Long/Short Term) |
| Breakout Length | 0.84m |
| Insertion Loss | ≤0.35dB |
| Return Loss | ≥65dB |
| Attenuation at 1310nm | ≤0.35dB/km |
| Attenuation at 1550nm | ≤0.21dB/km |
| Operating Temperature | -10 to 70°C (14 to 158℉) |
| Storage Temperature | -20 to 70°C (-4 to 158℉) |
| Fiber Mode | OS2 9/125μm |
| Wavelength | 1310/1550nm |
| Connector A | MTP®-12 APC (Female) |
Why pigtails remain the standard termination
A pigtail is half a connection: one end is an assembled at the factory connector, polished and tested under process control; the other is a bare fiber strand ready for the splice. Fusion-splicing that strand onto the fitted cable brings the interface connector quality of the factory to a field route. The result outperforms field-polished connectors on insertion loss, return loss and long-term stability, and it outperforms pre-terminated trunks when the route length is uncertain or the pathway is difficult to pre-measure.
Fusion splicing practice that protects the budget
A good splice starts long before the splicer arcs: strip the strand cleanly, cleave square, keep the sleeve staged, and protect the completed splice in the tray with the bend radius respected. The tight-buffered 0.9mm coating on this pigtail strips in one motion and seats cleanly in standard splice sleeves. Done well, a fusion splice adds less attenuation than a connector pair and stays stable for the life of the plant. For Nigerian deployments, retaining this detail with the acceptance records supports consistent maintenance.
Color coding as a working discipline
Twelve fibers, twelve colors, one order: the TIA-598 sequence is the only thing standing between a tidy splice tray and a crossed plant. The strands in this set comply with the standard sequence, which means the splicer matches colors between cable and pigtail without guesswork. When the documentation follows the same sequence, a fault on position seven months from now is found in minutes rather than traced strand by strand.
Keeping twelve-fiber splices organized
Multi-fiber splicing rewards method: whole one color fully - strip, clean, cleave, splice, sleeve - before starting the next, and dress every finished strand into the tray in sequence. The color-coded set makes the pairing unambiguous, and the tray stays readable for the next technician who opens it. A tray that reads distinctly is a tray that gets re-entered without new faults.
MTP pigtails for parallel-optics positions
Parallel-optics trunks arrive as multi-fiber cables and must become MTP ports on the rack panel. A twelve-fiber MTP pigtail makes that conversion in one splice operation per trunk tube: the twelve strands splice onto the backbone, and the factory-polished MTP interface presents the full dozen lanes as a single port. Per-lane documentation follows the fiber positions, keeping polarity and allocation unambiguous for the transceivers that will mate with the rack panel.
High-count pigtail trunks at the frame
At 144 fibers the economics of splicing change: twelve individual pigtail sets would occupy twelve individual dressing routes across the frame; at the same time, one pigtail trunk carries the full count in a single jacketed assembly with twelve MTP interfaces. The backbone cable splices strand by strand in the tray as always, but the rack panel side arrives as twelve finished ports. For dense ODF positions this construction halves the dressing work and keeps the frame readable.
Bend-insensitive glass in dense trays
Splice trays and panel rear spaces punish fiber: tight routing, crowded dressing and the occasional hurried re-entry all bend strands beyond what legacy single-mode tolerated. The bend-insensitive grade used in this pigtail holds attenuation stable at bend radii that would fog conventional glass, which keeps the link margin intact after the tenth tray opening, not just at commissioning. For Nigerian deployments, retaining this detail with the acceptance records supports consistent maintenance.
A splicing workflow that scales
Productive termination crews work to a fixed routine: mount the tray, dress the cable assembly, splice the pigtails color by color, protect every joint, test every completed port, then close and label. With the routine fixed, a two-person crew terminates a full frame position in a predictable time, and the test record maps cleanly onto the documentation. The consistency also makes quality auditable - same materials, same sequence, same pass criteria across each site.
Sparing and kit planning for termination work
Pigtails belong in the termination kit in counted sets with spares: strands break, connectors get contaminated beyond recovery, and a missing spare converts a ten-minute task into a second visit. Plan one spare set per frame position, keep spare strands capped and bagged, and record which set went into which tray so replacement stock can readily be ordered to the identical specification.
Inspection and Test Procedures
Each pigtail is optically tested before packing: insertion loss and return loss are verified on every terminated leg, and the ferrule end faces are inspected for scratches and contamination. The strands ship coiled, capped and bagged, with the test results available on request.
Ordering Information and Support
Refer to this pigtail by connector, polish, fiber mode, fiber count and construction at the request stage a quotation. For configurations outside the listed options - mixed connector families, jacket ratings, lengths or project packing - send the requirement with the enquiry and the factory will establish the manufacturable specification. For Nigerian orders, our team can check the requirement before coordinating manufacture and international delivery.



